Saturday, January 11, 2014

Slacking

Well its been cold, realllly cold so progress on old girl has come to a crawls pace.which is ok. Im gathering up everything i need for the projects ahead.

The wiring replacement seems like it will be a lot easier than initially anticipated. With a negative buss, electrical panel, battery, battery switch, shore hookup all going to be new as well as cabin,mast and nav lights. Its literally going to be a rip out of everything old and replace with all new.

Ive learned a lot more about the epoxy projects as well. The bow has a small area that needs attention. The inside lower cabin, under the seats needs some as well. The biggest will be under the mast compression beam.

And alllll wood interior pieces are being replaced with oak. Cheap,simple and nice looking at a fraction of the cost.

No comments:

Post a Comment